Tungsten Sangdong mine in South Korea returns to production after 30 years


Discover exactly where Smart Money is moving capital in real-time. By registering on our platform, you unlock the complete ExpertFX ecosystem: high-precision consensus algorithms, millimetric technical data, and elite educational guides on risk and emotional management. Secure your spot in the free environment before the VIP transition.
By using this site, you agree to our Terms of Use of Use and Privacy Policy
Almonty Industries (NASDAQ: ALM) (TSX: AII) announced Monday the completion of Phase 1 commissioning at its Sangdong tungsten mine in South Korea âmarking the return to production after more than 30 years.Â
Phase 1 of the Sangdong mine in Gangwon Province is now commissioned and producing, with the processing plant designed to handle approximately 640,000 tonnes of ore annually, yielding roughly 2,300 tonnes of tungsten concentrate per year. Â
A planned Phase 2 expansion, expected to come online in 2027, is designed to increase processing capacity to approximately 1.2 million tonnes of ore annually, doubling tungsten output to roughly 4,600 tonnes per year, the company said.
Sangdong has an expected mine life exceeding 45 years and an average ore grade of approximately 0.51% tungsten trioxide (WOâ), roughly three times the global average. At full capacity, Sangdong is expected to supply ~40% of global tungsten demand outside China, Almonty said.
Tungsten is a smaller market, but the industries that depend on it are getting exponentially bigger, and it is the material of choice for a key defense application â what the military calls penetrators â high-density, armour-piercing projectiles. Its also required in US Department of Defence (now War) contracts. Â
Tungsten production in the US ceased in 2015. The US had been mining tungsten, but it was no longer commercially viable due to low prices and competition from China, which controls over 80% of global production. Â
âThe completion of Phase 1 at the Sangdong tungsten mine marks the culmination of more than a decade of investment and development,â Almonty CEO Lewis Black said in a news release. Â
 âThis is a significant milestone in the effort by the United States and its allies to diversify supply chains for critical minerals away from China, which currently produces approximately 88% of the worldâs tungsten supply. With commissioning now complete, our focus turns to optimizing throughput and advancing toward full commercial production,â Lewis said. Â
âLooking ahead, the Phase 2 expansion and the development of our tungsten oxide facility and the adjacent Sangdong Molybdenum deposit will form the foundation of what we refer to as the âKorean Trinityâ â a fully integrated strategic-mineral value chain that positions South Korea as a global hub for the production, refining, and upgrading of tungsten.â Â