Montage Gold expands West African footprint as Koné approaches


Discover exactly where Smart Money is moving capital in real-time. By registering on our platform, you unlock the complete ExpertFX ecosystem: high-precision consensus algorithms, millimetric technical data, and elite educational guides on risk and emotional management. Secure your spot in the free environment before the VIP transition.
By using this site, you agree to our Terms of Use of Use and Privacy Policy
CĂŽte dâIvoire-focused Montage Gold (TSX: MAU) is digging deeper into West Africa as it expands exploration, even as Sahel tensions spur other Western miners to adapt to tougher terms in the region.Â
Six months after it acquired African Gold, Montage is consolidating its Didievi project and preparing to upgrade the resource in the third quarter. It plans to pour first gold later this year at its main Koné project in Cote dâIvoire.
âThe goal for us is to build a multiâasset company focused on Africa,â Montage CEO Martino de Ciccio told The Northern Miner in an interview Wednesday in downtown Toronto. âWe were in a unique position where we saw that smaller junior companies wanted to partner with us instead of partnering with established producers in the area.â
The companyâs approaching milestones this year come as the economics of KonĂ© â now almost built â highlight the Lundin family-backed Montage as a top tier West African gold developer according to the updated feasibility study released in 2024.
Meanwhile, in West Africaâs Sahel region, military governments in Niger, Burkina Faso and Mali, have changed mining laws, ramped up government stakes and sometimes seized assets since military coups five or so years ago. Western mining companies have opted to seek negotiation amid the atmosphere of resource nationalism.
$1.1B value
KonĂ©, located 470 km northwest of the countryâs financial capital Abidjan, has a net present value of $1.1 billion, at a 5% discount rate, with a 31% internal rate of return, according to the feasibility study. It could produce 349,000 oz. annually during its first three years at an all-in sustaining cost of less than $1,000 per oz. and a payback period of 2.6 years. Mine life is estimated at 16 years.
The 2,259-sq.-km property hosts 174.3 million probable tonnes grading 0.72 gram gold for 4 million oz. contained gold, according to a 2024 estimate.
The Lundin Group last year invested $53 million for a 19.9% interest in Montage, while Chinaâs Zijin Mining put in $57.3 million for a 9.9% stake.
Higher output possible
âAll eyes on the first gold pour at KonĂ© in Q4 and an updated mine plan on KonĂ© [as well],â De Ciccio said, noting that higher throughput towards 400,000 oz. per year is possible after the mine reaches nameplate capacity later in 2027.
But as it prepares for first gold, Montage is drilling 90,000 metres at KonĂ©âs satellite deposits such as Yere North, Petit Yao, Soman 1 and 2 and Lokolo West, with updated and initial resources expected in the coming weeks.
â[We] have three mineralized trends that converge on our property, so it gives [us] an abnormal amount of targets,â De Ciccio said. âWhat weâre trying to achieve is to find deposits that can come into the mine plan [from] day one, to displace lower grade ounces.â
Montageâs permit area at KonĂ© extends 35 km north of the mill, taking in the satellite targets of Petit Yao, Lokolo, Diouma North and others. It plans to seek permitting for targets further north of that, such as Sena, Soman 2 and Yere North.
âEverything within 75 km is truckable to our mill,â De Ciccio said. âIf this was in Canada, youâd be saying [KonĂ© is] âdistrict scale.ââ
Regional expansion
In the wider region, Montage earlier this year landed five prospective greenfield gold exploration permits in Mauritania in a competitive tender process. Those sites are a few hundred kilometres northeast of Kinross Goldâs (TSX: K, NYSE: KGC) Tasiast mine in the countryâs west.
De Ciccio sees the Mauritania permits as continuing its regional consolidation, after it gained the Mankono-SissĂ©dougou joint venture from Barrick Mining (TSX: ABX; NYSE: B) and Endeavour (LSE, TSX: EDV) in 2022. Mankono is now part of the KonĂ© complex. Then in 2024, Montage entered a partnership with Sanu Gold (CSE: SANU) gaining a 19.9% stake through a C$5.5 million share swap tied to Sanuâs Guinea exploration portfolio.
âNow we have other governments taking note of whatâs happening in CĂŽte dâIvoire and wanting us to join and come into their country as well, so that got us permits into Mauritania through a tender process.â
Incorporating Didievi
At its Didievi project, about 300 km southeast of Koné, a 40,000-metre drilling program is expected to wrap up in the coming weeks. Didievi hosts 12.4 million inferred tonnes grading 2.5 grams gold per tonne, for 989,000 ounces. The update is to upgrade the resource to indicated.
âWeâre looking to continue to build a multiâasset business with Didievi coming in one day,â the CEO said. âWe feel quite proud of whatâs been achieved so far, but we know that thereâs still a lot that remains to be achieved.â
Company shares were down almost 1% to C$15.82 apiece on Wednesday afternoon in Toronto, valuing the company at C$6.3 billion ($4.5 billion).