Americas extends hot track with successes of CosalĂĄ


Discover exactly where Smart Money is moving capital in real-time. By registering on our platform, you unlock the complete ExpertFX ecosystem: high-precision consensus algorithms, millimetric technical data, and elite educational guides on risk and emotional management. Secure your spot in the free environment before the VIP transition.
By using this site, you agree to our Terms of Use of Use and Privacy Policy
Americas Gold and Silverâs (TSX: USA; NYSE-A: USAS) latest CosalĂĄ assays extend a run of discoveries, production gains and mine-build work across Mexico and Idaho.
New CosalĂĄ infill holes reported Monday, drilled beside existing workings after the Oct. 31 resource cut-off, returned grades up to five times above the current resource model at the San Rafael Upper and 120 zones, and are now feeding into mine planning for the second half, the company says.
âMineral resource conversion drilling at the San Rafael Upper and 120 zones is consistently averaging two to three times the previously reported inferred mineral resource grades,â Chairman and CEO Paul Andre Huet said in a press release.
Hole SR568 cut 14 metres grading 599.8 grams silver tonne and 0.83% copper from 38.2 metres depth. Hole SR566 returned 10 metres grading 509.7 grams silver and 0.43% copper from 12 metres. In the 120 Lower zone, hole 120-25-G94 intersected 33.7 metres grading 388 grams silver and 0.98% copper from 100 metres depth, while hole 120-25-G95 returned 45 metres grading 342.9 grams silver and 0.85% copper from 106 metres.
The company has budgeted about $20 million (C$27.7 million) for a 64,000-metre drill campaign across the portfolio this year.
Americasâ Toronto-listed shares rose 2.4% on Monday afternoon at C$8.73 apiece, giving the company a market capitalization of C$2.9 billion. The stock has quadrupled over the past 12 months.
Discovery streak
In Idaho, Americas â a narrow-vein specialist â reported a fourth discovery at Galena, the 43L-TJ vein complex, about 150 metres southwest of the 149 Vein and within 25 metres of current infrastructure. The 149 Vein delivered a standout hit in the companyâs recent drill work: 0.21 metre grading 24,913 grams silver per tonne and 16.9% copper in hole 43-317.
There, hole 43-357 also cut a more substantial 1.9 metres grading 1,392 grams silver, 1.5% copper and 1.5% antimony from about 25.8 metres depth. The company had also flagged the 520 Vein at Coeur, where hole CO34-166 cut 1.1 metres grading 619 grams silver, 1.1% copper and 0.65% antimony from about 325.2 metres depth.
Galena streamlined
Located in Idahoâs historical Silver Valley, about 600 km north of state capital Boise, Galena is one of the longest-running silver mining operations in the U.S. The company consolidated full ownership of Galena in December 2024, added the nearby Crescent mine for $36 million that same month and formed a 51-49 joint venture with United States Antimony (NYSE-A: UAMY) in February to build a hydromet processing plant in Idaho.
It also moved last month to end a 600,000 oz. silver stream with Sprott Mining on Galena, giving it more access to the metal it produces in a record silver market.
In April, Americas announced the next stage of work at Galena and Crescent would entail building a paste backfill plant meant to cut cycle times by about 250%; No. 3 shaft upgrades to lift hoisting capacity to about 105 short tons per hour and 1,350 tons per day; a mill expansion to 1,200 tons per day from 750 tons per day; and more than 198 metres of development at Crescent in the three months ended March 31.
Production momentum
Americas mid-April reported record first-quarter silver production of 787,000 oz., up 76% from 446,000 oz. a year earlier, and record sales of 830,000 oz., boosted by the timing of concentrate sales.
The company declared commercial production at the EC120 deposit at CosalĂĄ early this year after recognizing 1 million oz. silver and $44.8 million in net revenue during its ramp-up last year. The deposit is critical to Americas maintaining its full-year production guidance of 3.2 to 3.6 million oz. silver.