Aya logs bonanza silver hits Zgounder mine in Morocco


Discover exactly where Smart Money is moving capital in real-time. By registering on our platform, you unlock the complete ExpertFX ecosystem: high-precision consensus algorithms, millimetric technical data, and elite educational guides on risk and emotional management. Secure your spot in the free environment before the VIP transition.
By using this site, you agree to our Terms of Use of Use and Privacy Policy
New drilling at Aya Gold & Silverâs (TSX, Nasdaq: AYA) Zgounder mine in Morocco yielded several bonanza hits near and below the limits of the current open pit.
The standout intercept came from underground hole T28-26-1248, which cut 8 metres of 2,176 grams silver per tonne from 8 metres downhole, including 4 metres of 4,298 grams silver from the same depth, Aya said Tuesday in a statement. Hole ZG-RC-26-946 in the open-pit area cut 6 metres grading 1,867 grams silver from 96 metres depth. Zgounder is about 215 km south of Marrakech by road.
âContinued high-grade intercepts across the open pit, central zone, and Western Fault contact reinforce the strong continuity of silver mineralization at Zgounder at depth and along strike,â Scotia Capital mining analyst Eric Winmill said in a note. Zgounder accounts for 41% of Ayaâs net asset value, according to Winmillâs calculations.
Zgounder is one of the worldâs few silver-only operations, generating all its revenue from silver dorĂ© production. The mine, whose operating life is projected to run until 2036, produced 4.8 million oz. of the metal last year. Itâs one of two key Moroccan assets for the company â along with the Boumadine polymetallic project, which is advancing toward a late 2027 feasibility study.
Aya shares rose 2.5% to C$29.36 in early afternoon trading Tuesday in Toronto, valuing the company at about C$4.2 billion ($3 billion).
Solid reserve base
Other notable results include hole ZG-RC-26-942 in the open-pit area, which cut 10 metres of 739 grams silver from 129 metres downhole. Nearby hole ZG-RC-26-799, meanwhile, cut 6 metres of 1,160 grams silver from 6 metres depth. The latest results were generated from 116 drill holes, Aya said.
Aya completed a major expansion of the operation in 2024, boosting the plantâs processing capacity to 1.4 million tonnes per year.
Zgounder hosts proven and probable reserves of 15.7 million tonnes grading 145 grams silver for contained metal of 73.4 million oz. silver, according to a December 2025 resource.
New zones
Exploration has been a major focus at Zgounder in recent years. Aya has consistently reported high-grade results from both near-mine and at-depth drilling programs, including the discovery of new mineralized zones north of the open pit and extensions of mineralization along the Western Fault corridor.
New intersections near the Western Fault âcontinue to support the significant exploration potential to the west,â where development of the exploration drift at the 1825-metre level is advancing ahead of planned drilling west of the fault in the second half of 2026, CEO Benoit La Salle said in the companyâs statement.
Aya has finished about one-third of its planned 30,000-metre exploration program at Zgounder this year.