DPM makes gold-copper discovery near Bulgaria mine


Discover exactly where Smart Money is moving capital in real-time. By registering on our platform, you unlock the complete ExpertFX ecosystem: high-precision consensus algorithms, millimetric technical data, and elite educational guides on risk and emotional management. Secure your spot in the free environment before the VIP transition.
By using this site, you agree to our Terms of Use of Use and Privacy Policy
Canadian producer DPM Metals (TSX, ASX: DPM) said new drilling at its Brevene South Porphyry (BSP) site in Bulgaria yielded a major gold-copper discovery about 1 km from the Chelopech underground mine’s reserve footprint.
Standout hole EX_BRESPO_03 cut 713 metres grading 1.31 grams gold per tonne and 1.16% copper from 1,172 metres downhole, DPM said Wednesday in a statement. Within that interval, DPM cut 398 metres of 1.48 grams gold and 1.45% copper from 1,487 metres depth. The hole is still in progress.
The results distinguish BSP “as a potentially very high-grade porphyry system,” RBC Capital Markets mining analyst Harrison Reynolds wrote in a note. “Proximity to existing mine infrastructure de-risks the path to eventual economic extraction.”
Shares of DPM rose 1.6% to C$46.70 Wednesday morning in Toronto, valuing the company at about C$10.3 billion ($7.5 billion).
Main asset
The discovery was made at the BSP target in the southeastern portion of the Brevene exploration licence, contiguous with the Chelopech mine concession.
Located about 75 km east of Sofia, Chelopech is one of Europe’s highest-grade operating gold-copper mines. In commercial production for more than two decades, it serves as the company’s main asset. Recent exploration success at the nearby Wedge Zone Deep prospect has highlighted the potential for additional resources within and around the mining district, DPM says.
The new zone, which lies within a hydrothermal system measuring more than 1,000 by 1,500 metres, remains open for expansion. DPM said the scale of the alteration system and the continuity of mineralization encountered so far suggest significant upside potential as drilling continues.
DPM has mobilized five high-capacity drill rigs to the BSP target. It plans up to 15,000 metres of additional drilling by the end of the year “with the key question being whether continuity and geometry can be confirmed to support a resource,” Reynolds said.
Other highlights released Wednesday include hole EX_BRES_555_02, which cut 95 metres grading 0.43 grams gold and 0.48% copper from 1,250 metres downhole, and hole EX_BRES_555_02A, which cut 37 metres grading 0.53 grams gold and 0.63% copper from 1,357 metres depth.
Fourth discovery
Inferred resources are pegged at 9.1 million tonnes grading 1.96 grams gold, 9.38 grams silver and 0.57% copper for contained metal of 573,000 oz. gold, 2.74 million oz. silver and 114 million lb. copper.
DPM forecasts Chelopech will produce between 150,000 and 170,000 oz. gold this year, as well as 29 million to 34 million lb. copper.